Scope of Work for the Shipowner
The main conversion scope included new bulkheads, additional cranes, an offloading reel, several deck modules, and the relocation of the helideck. Deltamarin's commission for the owner covered detail design, including
- Piping and electrical engineering detail design (including Aveva model)
- Pre-commissioning and commissioning support for the client
- Full naval architecture package, including weight control and inclining experiment
- As-built documentation (whole package)
- Supporting the client's document control team with quality folder checks and management
Project Features
- Joining a complex project during its final 1.5-year phase and addressing all engineering requirements
- Taking over the entire Aveva model environment
- Providing a wide range of services across multiple disciplines
- Maintaining a strong on-site presence at the shipyard through the local Deltamarin office in Gdańsk
- The work was completed between 2017 and 2018