Scope of Work for the Shipowner
- Concept design
 
Scope of Work for the Shipyard
- Basic design
 - Detail design
 - Technical procurement handling
 - Site team to take the design to production
 
Project Features
- The model tested daily fuel oil consumption at design draft shall be only 17.9 t, including 15% sea margin, ISO conditions
 - EEDI below the 2020 requirement (20%)
 - High cargo volume
 - Shallow draft with high deadweight
 - Open hatch version
 - Ice Class 1C