Pioneiro de Libra (conversion)
Ship type
FPSO
Shipowner
OOG-TK Libra GmbH & Co KG
Shipyard
Sembcorp Marine Jurong Shipyard Pte Ltd.
Project type
Conversion
Ship status
Delivered
Design scope
Concept,
Basic
Delivery year
2017
Copyright: Teekay
Scope of Work for the Shipowner
- Bid support for Libra field tendering
- The target for engineering was to verify the feasibility of the conversion and provide information for capital expenditure analysis
- Basic set of documentation was prepared including general arrangement, conversion specification and stability check
Scope of Work for the Shipyard
- Basic engineering of the hull and utilities
- Scope included structural design; strength and FEA calculations; accommodation and HVAC design; P&IDs for marine and utility systems; electrical and instrumentation for the hull; procurement support for main equipment; and HSE considerations
- Deltamarin also provided interface management
Project Features
- Storage capacity 650,000bbl, production rate 50,000 bbl/d
- A very complex fatigue life analysis was conducted due to the vessel’s long service history in North Sea conditions and its relatively high age
- The vessel will serve the Libra pre-salt field in the ultra-deepwater section of Brazil’s Santos Basin as an early well-testing unit
- The project was a fast track project with a delivery time of only 23 months
- The work was completed in 2017
Main Dimensions
- Dwt 120 367
- GT 86 873
- Capacity 650,000 bbl
- LoA 310,15
- Beam 50,5
- Draught 16,019
Additional Information