Petrojarl Banff

Ship type
FPSO
Ship owner
Teekay Corporation
Shipyard
Blohm+Voss GmbH
Project type
Newbuild
Ship status
Delivered
Design scope
Concept, Basic, Detail
Delivery year
2012
Petrojarl Banff
Copyright: Jens Boldt, ShipSpotting.com

Commission for the Ship Owner

  • Design of strengthening the mooring system foundations in turret and vessel hull to accommodate upgraded mooring lines
  • Strength and fatigue analyses, including design loads development and fatigue analysis procedure
  • Naval architectural design required for the reinstallment project
  • Technical support during work execution at the yard

Project Features

  • The vessel experienced multiple mooring line breaks during a severe North Sea storm in 2011. Deltamarin provided technical support throughout the reinstallment project, including the development of strengthening concepts, basic design, and work execution at the yard.

Main dimensions

  • Dwt 20 800
  • GT 18 488
  • Capacity 88,000 bbl
  • LoA 120,4
  • Beam 53,5
  • Draught 16,13

Additional Information

  • IMO Number 9184330
  • Special features North Sea FPSO reinstallment