Skip to content
Piltun B (Pa-B)
Ship type
Production platform
Shipowner
Sakhalin Energy Investment Company Ltd.
Shipyard
Samsung Heavy Industries Co. Ltd.
Project type
Newbuild
Ship status
Delivered
Design scope
Basic,
Detail
Delivery year
2006
Copyright: Sakhalin Energy Investment Company Ltd.
Scope of Work for the Shipyard
- Deltamarin’s scope of FEED phase work for RR Offshore included participating in piping and structural engineering for main mechanical outfitting (MMO), conducting strength analysis (specifying calculation targets, methods, tools, schedule, and necessary resources), and performing strength calculations
- Deltamarin's scope of workshop engineering involved coordinating MMO engineering, following up on the engineering schedule, coordinating fabrication engineering (including method statements, schedule follow-up, and site assistance), engineering ice shields, and providing site assistance in Astrakhan and Nahodka
- Under RR Offshore's organization, Deltamarin engineers also participated in engineering management, structural lead, caisson system lead, ice shield lead, preparing job cards for production, and material flow contro
Project Features
- The Piltun-Astokhskoye-B (PA-B) platform is the largest oil and gas production platform in the Sakhalin-2 project
Main Dimensions
- GT 90 541
- LoA 94
- Beam 91,5
Additional Information