Commission for the Shipyard
Complete design and engineering package, including
- Concept development
- Basic design
- Detail design
Project Features
- The first LNG carriers constructed by CMHI Jiangsu Shipyard (CMHI-282-01..08)
- Five confirmed orders with three additional options, with the first vessel set for delivery in 2026
- Scantling deadweight tonnage of 96,000 t at a draught of 12.5 m
- Cargo capacity of 180,000 cbm, or 176,400 cbm at 98%, utilizing GTT Mark III Flex technology
- Two MAN 5GME-C10-GA main engines
- Service speed of 19.5 knots on non-continuous rating (NCR), allowing for a 20% sea margin
- Equipped with an air lubrication system