Scope of Work for the Shipowner
Concept development, including
- Feasibility studies
- Outline (tender) design
- Contract design
Scope of Work for the Shipyard
- Complete basic and detail design package
Project Features
- The Shaper class comprises a series of eight PCTCs
- Each vessel has a capacity of 9,300 CEU and is powered by dual-fuel methanol engines
- Arctic Tern, the first vessel of the class, was delivered in July 2026