Scope of Work for the Shipowner
- Outline project
 - Contract design
 
Scope of Work for the Shipyard
- Basic design
 - Detail design
 - Technical procurement handling
 - Site team to take the design to production
 
Project Features
- The model tested daily fuel oil consumption at design draft shall be only 17.9t including 15% sea margin, ISO conditions
 - EEDI more than 20% below required limit
 - High cargo volume
 - Shallow draft with high deadweight