Scope of Work for the Shipowner
- Concept design
Scope of Work for the Shipyard
- Approval design (basic and detail)
- Technical procurement handling
- Site assistance
Project Features
- First ever B.Delta68 order
- Design based on the B.Delta82 well tested hull and tailor-fit for the customer’s special purposes
- The model tested daily fuel oil consumption at design draft 22.9 t including 15% sea margin, ISO conditions
- EEDI phase 2 requirement fulfilled (20% below the reference line)
- High cargo volume
- Shallow draft with high deadweight