Scope of Work for the Shipowner
- Concept design for a new generation of self-unloading lake bulk carriers
- Project development and model testing
- Contract design
Scope of Work for the Shipyard
- Basic and detail design package
- Procurement and on-site technical support
Project Features
- The first diesel-electric laker and the first single point loader to operate in Canada
- Several innovations are integrated into the design to reduce the overall environmental footprint, including diesel-electric Tier 3 engines, a ballast water treatment system, a waste heat recovery system and quieter machinery
- Modern hull design and a state-of-the-art propulsion system enhance the vessel's maneuverability and increase navigation safety in shallow waterways