Scope of Work for the Shipowner
- Arrangement drawings
- Safety plans
- Classification drawings
- Basic design drawings for outfitting and systems
- Management of basic design
Scope of Work for the Shipyard
- Construction drawings
- HVAC and piping coordination plans
- Site assistance for steel and piping design
Project Features
- The ship had previously sailed in the Caribbean and Far East, and upon starting operations in the Baltic region, a comprehensive refurbishment was necessary
- The conversion included adding a sliding pool cover, enlarging shopping areas, and rearranging conference areas and other public rooms
- On the technical side, waste handling systems were modified, a new air conditioning system was installed for the covered pool area, and an ice-belt was added to ensure year-round operation