Scope of Work for the Shipyard
- Project and basic design, including general arrangement, machinery arrangement, principal piping diagram and hull form design with model test coordination
- The scope also covered stability and hydrostatics, lightweight calculations, steel classification drawings and principal outfitting and interior drawings
Project Features
- 11% lower fuel consumption with Deltamarin hull form
- Complete basic design delivered in a short timeframe, with class drawings completed in 8 weeks