Scope of Work for the Shipowner
Pre-feed of FPSO conversion, including
- General arrangement
- Main marine system schemes
- Main structural changes
- Conversion specification
- Engineering support at the client’s Singapore office
Project Features
- The vessel was designed to separate condensate from wet gas. The gas will be injected back into the well after separation, and part of it will be used to power a gas turbine power plant.
- Large-volume compressor trains are required for high-pressure compression needed for reinjection into the reservoir
- Turret mooring allows the vessel to weathervane according to the prevailing wind direction
- Offloading is performed via a floating hose at the stern