Commission for the Ship Owner
- Design of strengthening the mooring system foundations in turret and vessel hull to accommodate upgraded mooring lines
- Strength and fatigue analyses, including design loads development and fatigue analysis procedure
- Naval architectural design required for the reinstallment project
- Technical support during work execution at the yard
Project Features
- The vessel experienced multiple mooring line breaks during a severe North Sea storm in 2011. Deltamarin provided technical support throughout the reinstallment project, including the development of strengthening concepts, basic design, and work execution at the yard.