Commission for the Shipyard
Complete design and engineering package, including
- Concept development
- Basic design
- Detail design
Project Features
- The first LNG carriers built by CMHI Jiangsu Shipyard (CMHI-282-01..08)
- Five firm orders, three options – the first vessel will be delivered in 2026
- Scantling DWT 96,000 t @ 12.5 m draught
- Cargo containment: 180,000 cbm (176,400 @ 98%) / GTT Mark III Flex
- Main engines: 2 x MAN 5GME-C10-GA
- Service speed: 19.5 kn on NCR with 20% sea margin
- Air lubrication system