Scope of Work for the Shipyard
Complete design and engineering package, including
- Concept development
- Basic design
- Detail design
Project Features
- 9,300 CEU methanol dual-fuel PCTCs
- The vessels will be built by CMHI Jiangsu
- The second vessel in the class, CM Shen Zhen, was delivered in November 2025