Scope of Work for the Shipowner
Basic design for Ulstein Sea of Solutions B.V., including:
- General discipline
- Arrangement
- Structural design
- Outfitting
- Marine systems
- Electrical systems
Project Features
- The barge was originally built in 2006 by Sainty Yizheng Shipbuilding Corp Ltd and was converted for pipelay operations in 2010 in Romania
- Deck cargo barge was modified into an anchor-moored, shallow-water pipelay barge in 2010
- Subsequent upgrades included the installation of 6 azimuthing thrusters and a DP system