Commission for the Ship Owner
- Detail engineering
- Creation of a 3D AVEVA structural model incorporating partially integrated mission equipment foundations, along with a 3D CADMATIC mechanical model for pre-coordination purposes
Commission for the Shipyard
Basic engineering, including
- Naval architecture
- Structural, including strength calculations and FEA (Finite Element Analysis)
- Deck outfitting and arrangements
- Mission equipment arrangements (partially)
- Marine systems (PID), ventilation, and arrangements
- Technical equipment specifications of main equipment
- Accommodation
- Electrical and automation (partially)
Project Features
- The vessel is capable of laying pipes in both S- and J-Lay configurations
- Main crane capacity of 5,000 tonnes
- Project executed with Jurong shipyard in Sinapore, vessel later completed by Shanghai Zhenhua Industries in China