Scope of Work for the Shipowner
Full class approval design package for the retrofit, including
- Naval architecture
- Structural design and analysis
- Deck outfitting
- Machinery and electrical work
Project Features
- The MR chemical tanker built in 2022 was retrofitted with two 35 x 5 m Norsepower rotor sails
- The work was finalized in 2024