Scope of Work for the Shipowner
Contract design including
- General arrangement; specifications; design of tanks, pump room, supports and insulation; gross tonnage calculation; structural principles; lightweight considerations; hull form; and tank arrangement
- Loading conditions; intact stability; damage stability; powering; electric load analysis; and heat balance
Project Features
- Asphalt/bitumen tanker