Scope of Work for the Shipyard
- Basic and detail design
- System-responsible engineering for one-third of all ship systems
- Area-responsible engineering
- Technical handling of procurement
- Site assistance
Project Features
- The largest engineering contract in Deltamarin’s history at the time, with a total duration of about 4 years
- Originally ordered by Genting Hong Kong from MV Verften Wismar GmbH. Later acquired by Disney Cruise Line and building completed under Meyer Werft at Wismar.
- Among the special features of the vessel, Deltamarin was responsible for the complete engineering of three vertical main fire zones, which accounted for one-third of the entire ship