Scope of Work for the Shipowner
- Concept development of conversion principles including relocating spaces to find room for the LNG tank, minimizing impact on vessel functionality and passenger spaces
 - Basic design documentation for the conversion
 
Project Features
- The vessel was converted in 2020 from fuel oil to LNG fuelled machinery
 - Technically challenging conversion including several “first-ever” features
 - Very flexible powering pattern allowing operation of vessel with lean-burn LNG to pure electrical battery power
 - The work was completed between 2019 and 2020