Scope of Work for the Shipowner
- Feasibility study
- Project development
- Model tests
- Contract project
- Support in contract discussions
Scope of Work for the Shipyard
- Basic design
- Detail design
- Technical procurement handling
- Site team to take the design to production
Project Features
- The first order of the B.Delta25 type
- The model tested daily fuel oil consumption at design 16.6 t including 15% sea margin, ISO conditions
- EEDI below the 2020 requirement (20%)
- High cargo volume
- Shallow draft with high deadweight