Commission for the Ship Owner
- Concept development of conversion principles including relocating spaces to find room for the LNG tank, minimizing impact on vessel functionality and passenger spaces
- Basic design documentation for the conversion
Project Features
- The vessel was converted in 2020 from fuel oil to LNG fuelled machinery
- Technically challenging conversion including several “first-ever” features
- Very flexible powering pattern allowing operation of vessel with lean-burn LNG to pure electrical battery power
- The work was completed between 2019 and 2020