Commission for the Ship Owner
- Project execution study
- Project coordination
- Vendor package verification studies, including top drive system, draw works, BOP equipment system, pipe rack system, pipe handling system, ventilation system, derrick cranes, amine regeneration system, filtration of oily water system, offloading system, mud pumps, and cutting injection
- Study of platform construction schedule
- Elaboration of proposals
Project Features
- Russia’s only offshore Arctic oil platform