FPSO ‘Aoka Mizu’

FPSO ‘Aoka Mizu’

FPSO Conversion

Customers: Bluewater Energy Services B.V.
Owner: Bluewater Energy Services B.V.
Shipyard: Sembawang Shipyard Pte Ltd.

Main dimensions of the FPSO:

Storage 500,000 bbl
LOA 248.12 m
Beam over all 46.7 m
Depth, mld 21.2 m
Accommodation 84 persons
Internal turret mooring system

Classification: DNV Offshore Rules, Flag state (SINA) / IMO, UK Statutory, NORSOK.

Commission:

  • Basic engineering including Class approval of the Hull part of the FPSO including structural design inclusive strength- and FEM calculations, accommodation and deck outfitting, P&ID´s of marine and utility systems, electrical & instrumentation,  procurement activities of main equipment.
  • Pre-coordination design including TRIBON 3D model of the aft machinery spaces and forward utility areas inclusive all piping down to pipe size 2 1/2”, ventilation ducting, cable trays and steel outfitting issues like stairs, ladders etc.
  • Detailed engineering including Cable routing (Topside excluded).
(DM/2006-2007)
Esa Jokioinen
Sales, offshore
Tel. +358 2 4336 344
Mobile +358 40 834 8112
esa.jokioinen@deltamarin.com
Comments are closed.