Main dimensions:

Storage capacity abt. 180,000 tonnes
Production capacity abt. 40,000 bpd

Commission:

FEED (Front End Engineering and Design) for life extension and upgrade work of an FPSO to operate on the North Sea. Deltamarin scope of work consisted of:

  • Feasibility studies on key issues
  • Hull strength and fatigue analysis
  • Hull upgrade design
  • Marine and utility systems design
  • Replacement of power plant gas turbines with tri-fuel diesel generators

Special Features

  • Due to the age of the vessel significant repair and life extension work was expected.
  • Diesel generators were planned to run directly with the produced crude oil