Customers: Teekay, Norway
Owner: Teekay, Norway
Shipyard: Blohm & Voss Repair Shipyard, Germany
Main dimensions of the FPSO:
Storage | 88,000 bbl |
Production rate | 90,000 bbl/d |
LOA | 120.40 m |
LPP | 107.80 m |
Breadth, mld | 53.40 m |
Accommodation | 60 persons |
Internal turret mooring with | 10 riser slots |
Commission:
PJ Banff FPSO suffered a multiple mooring line break in a severe North Sea storm in 2011. The objective was to provide the customer technical support during the reinstallment project including strengthening concept development, basic design and work execution at yard.
- Design the strengthening of the mooring system foundations in turret and vessel hull for upgraded mooring lines.
- Strength and fatigue analyses including design loads development and development of fatigue tanalysis procedure.
- Naval architectural design necessary for the reinstallment project.
- Technical support during work execution at yard.
Customer Benefits:
- Technical support in a demanding fast track reinstallment project.
- Successful completion of the reinstallment project.
(DM/2012-13)

Jaakko Lappi
Sales, cruise ships and offshore
Tel. +358 9 4788 4424
Mobile +358 40 0807 587
jaakko.lappi@deltamarin.com
Sales, cruise ships and offshore
Tel. +358 9 4788 4424
Mobile +358 40 0807 587
jaakko.lappi@deltamarin.com
Comments are closed.