FPSO Petrojarl Banff

FPSO Petrojarl Banff

North Sea FPSO Reinstallment

Petrojarl Banff FPSO
Customers: Teekay, Norway
Owner: Teekay, Norway
Shipyard: Blohm & Voss Repair Shipyard, Germany

Main dimensions of the FPSO:

Storage 88,000 bbl
Production rate 90,000 bbl/d
LOA 120.40 m
LPP 107.80 m
Breadth, mld 53.40 m
Accommodation 60 persons
Internal turret mooring with 10 riser slots

Commission:

PJ Banff FPSO suffered a multiple mooring line break in a severe North Sea storm in 2011. The objective was to provide the customer technical support during the reinstallment project including strengthening concept development, basic design and work execution at yard.

  • Design the strengthening of the mooring system foundations in turret and vessel hull for upgraded mooring lines.
  • Strength and fatigue analyses including design loads development and development of fatigue tanalysis procedure.
  • Naval architectural design necessary for the reinstallment project.
  • Technical support during work execution at yard.

 Customer Benefits:

  • Technical support in a demanding fast track reinstallment project.
  • Successful completion of the reinstallment project.
(DM/2012-13)
Jaakko Lappi Deltamarin
Jaakko Lappi
Sales, cruise ships and offshore
Tel. +358 9 4788 4424
Mobile +358 40 0807 587
jaakko.lappi@deltamarin.com
Comments are closed.