Main dimensions of the FPSO:
Storage | 280,000 bbl |
Production rate | 140,000 bbl/d |
LOA | 250.20 m |
Breadth | 34.00 m |
Accommodation | 70 persons |
Commission:
Two davit-type lifeboats located alongside the accommodation block were replaced by four free-fall lifeboats. Harsh environment offshore installation carried out on the Foinaven field, West of Shetland.
- Design, analysis and approval engineering for modifications on board to successfully install the new lifeboats.
- Detail engineering of supporting structure.
Special Features:
- All structural modifications and installation work were done offshore.
- Very limited installation window due to harsh sea condition.
- Fast-track design and engineering supporting tasks during the short installation window.
Customer Benefits:
- Additional crew members on board to fulfil new requirements and improve effectiveness.
- Demanding structural design and calculations with class approval done in strict schedule.
- Flexibility and quick response from Deltamarin throughout the design and installation period.
(DM/2012-2015)
Photo: Teekay

Jaakko Lappi
Sales, cruise ships and offshore
Tel. +358 9 4788 4424
Mobile +358 40 0807 587
jaakko.lappi@deltamarin.com
Sales, cruise ships and offshore
Tel. +358 9 4788 4424
Mobile +358 40 0807 587
jaakko.lappi@deltamarin.com
Comments are closed.